Importers & distributors
Define a model, controller bundle, market documents and channel package.
Game Box & Stick · B2B category
Build a channel-ready game device SKU around hardware, storage, controller, software image and lawful content—not unverified game or emulator counts.
Commercial baseline: ready-stock sample 1 pc; OEM MOQ 500 pcs; ODM MOQ 2,000 pcs. Final configuration, availability, price and schedule are quotation-controlled.
Buyers and channels
Define a model, controller bundle, market documents and channel package.
Control logo, enclosure presentation, UI, packaging, manual and accessories.
Lock one reproducible SKU and test the full customer setup before listing.
Confirm product, controller, cable, power and packaging contents for the project.
Selection dimensions
Box, stick or handheld route; installation, cooling and portability.
Chipset, memory, storage medium, ports and display output for the quoted version.
Connection type, mapping, quantity, latency and compatibility.
System image, UI, update route and documented rights for any supplied content.
Current model range
| Model | Approved public configuration | Project confirmation |
|---|---|---|
| M5 GAME | S905L · 64GB · Linux | Confirm controller and package |
| M15 | Linux · 8GB / 16GB / 50GB / 64GB / 128GB options | Confirm storage image and content rights |
| M66 | EmuELEC · 64GB / 128GB options | Confirm storage image and content rights |
| M88 | 128GB · EmuELEC | Confirm controller and content manifest |
| X2 | S905L · Linux · 50GB / 90GB options | Confirm controller and content manifest |
| X2 Pro | S905L · Linux · 50GB / 90GB options | Confirm controller and content manifest |
| X3 | H313 · 1GB+8GB+64GB · single-band Wi-Fi · Linux + Android 10.0 | Confirm exact system image and content rights |
The product cards below link to the unique formal URL for each model.
Applications
Confirm the exact environment, configuration, package and acceptance criteria before approval.
Confirm the exact environment, configuration, package and acceptance criteria before approval.
Confirm the exact environment, configuration, package and acceptance criteria before approval.
Confirm the exact environment, configuration, package and acceptance criteria before approval.
Category-specific OEM / ODM
OEM and ODM feasibility is confirmed against the exact model and project brief.
Ask an engineerApproved commercial routes
Dispatch within 48 hours when stock and payment are confirmed.
OEM work such as silkscreen and firmware normally needs 7–10 working days after scope confirmation.
Custom-mould ODM normally needs 30–45 working days after engineering scope confirmation.
Exact start date, exclusions, remedy and freight responsibilities are controlled by the quotation or contract.
Customized samples normally need 5–7 working days. These periods exclude shipping transit and depend on confirmed assets, configuration and approval scope.
Sample and RFQ inputs
Related buyer guides
Category FAQ
Compare enclosure, cooling, ports, power, storage, portability and controller requirements for the sales channel.
Do not rely on a headline count. Confirm the exact lawful software/content manifest, storage image and rights responsibility in the quotation.
Confirm connection, mapping, quantity, latency, range, battery or charging, compatibility and the complete package contents.
Test the exact hardware and software image, display output, storage, controllers, UI, heat, stability, packaging and content manifest.
Logo, label, color, UI, packaging, manual, storage image and accessory bundle can be reviewed. Enclosure, PCB and tooling need engineering confirmation.
Start with one traceable project brief
TOPLEO responds within 2 hours during published working hours and will define what must be confirmed before sample approval.
Request a quote